Demolition of an existing garage and the construction of a two bay garage


Demolition of an existing garage and the construction of a two bay garage

KEY FACTS

  • Existing garage in poor condition
  • Replacement garage sympathetically designed
  • Replacement garage located in improved position

SECTORS & SERVICES USED:

  • Conditions
  • Green Belt
  • Planning Applications
  • Residential Plots

CONTACT:

SHARE:

Bloomfields were instructed to prepare an application for the demolition of an existing garage and the construction of a replacement garage.  The existing garage was in a bad state of repair and very unsightly.  In contrast, the replacement garage was of a sympathetic design in keeping with the local landscape.

An application for a 2-bay garage was prepared, and the application was subsequently approved, subject to providing an Arboricultural Impact Assessment and Method Statement.  Bloomfields prepared the application and successfully discharged this pre-commencement condition, allowing the client to commence the project.